
Vandenberg AFB Mid Century Chapel Demolition
JGM is currently under contract to demolish vacant Building 13022 at Vandenberg AFB, including its basement, slabs, adjacent sidewalks, marquee, interior floor/walls/ceiling, exterior walls/roof/chimney/steeple, and existing equipment (e.g. heating/sprinkler systems) and furnishings (e.g. pulpit) within the building, as well as abate and dispose of any Asbestos Containing Material (ACM) or lead-based paint (LBP) within or on the building, at Vandenberg AFB, CA.
Share