JGM was tasked with the reconstruction of the existing parking lot facility and decommissioning a section of existing roadway. Additionally, construction improvements included clearing and grubbing, roadway obliteration, removal and replacement of existing guard rail, asphalt concrete pavement, sidewalk, curb and gutter, and signing and striping was also completed.